As a key contributor to the project’s accelerated timeline, SurePods played a critical role by prefabricating and delivering 240 bathroom pods.
Hear from Thomas Kaptur, SurePods Project Manager for the Minneola Project, on how we successfully delivered all 80 pods for this facility in just 4 days. SurePods engaged early in the design phase to assist with BIM coordination, mockups, and fixture selection. Pods were staged before the building's exterior was completed, allowing other trades to continue work efficiently. Detailed planning ensured proper MEP connections and unobstructed installation paths. Each pod was placed in designated depressions with pre-coordinated templates, optimizing workflow and minimizing on-site adjustments.
We Think You'll Like ...
As a key contributor to the project’s accelerated timeline, SurePods played a critical role by prefabricating and delivering 240 bathroom pods.
SurePod’s innovative strategies were instrumental in achieving the successful completion of this 260,000 sq. ft. outpatient facility.
This Women's Tower expansion project consisted of adding five stories over the existing two story portion of the hospital.