Virtual Tours

Virtual Tours

surepods-logo.png

Trinity Health Replacement Campus, Minot ND

1/1

Scope: 140 Bathrooms & 700 Wet Wall Cartridges

Location: Minot, ND

Status: Preconstruction

Owner: Trinity Health

General Contractor: JE Dunn Construction

Architect: TEG Architects

Interesting Fact:

Originally not designed for pods but SurePods worked with the Project team to standardize bathroom design.

PROJECT DETAILS

2300 Principal Row Ste 101

Orlando FL, 32837

 

[email protected]

407-859-7034

  • YouTube
  • Twitter
  • LinkedIn
  • Facebook

© 2020 SurePods