
Are you interested in hearing how developer on Wilshire Grand in Los Angeles saved 6 months on their construction timeline?
You may have heard, the Wilshire Grand Center opened its doors to the public this past Friday, June 23rd. It was a grand opening indeed.
Turner Construction’s project manager/architect, Christopher Martin talks with Andrea Bernstein, correspondent at KPCC in a 52-second news clip that credits SurePods prefabricated bathrooms with saving 6 months on the project schedule.
Visit KPPC Website
Listen to the 52-second video clip and hear from Wilshire Grand Project Manager.