SurePods Bathroom Pod design model for United States Army Barracks Ft Carson CO
SurePods Bathroom Pod at United States Army Barracks Ft Carson CO
United States Army Barracks Ft Carson CO
1/5
Scope: 120 Bathrooms
Location: Fort Carson, CO
Status: Opened 2012
Interesting Fact:
The design-build team was able to achieve a LEED Gold project certification. The project team also earned the National DBIA Award for this Fort Carson Project.